Pumps and Motors

  • Water hardly an agenda for politiciansTwo of the three main political parties in fray for the Parliamentary elections, the Congress and the BJP, have just paid lip service to water conservation, while the AAP is atleast talking about Gram Sabhas holding decision making powers for water projectsPiped...
    ravleenposted 5 years 5 months agoread more
  • Delhi prone to floods: IPCCThe Yamuna River floodplains need to be kept free as buffer zones to absorb the damage due to extreme weather events, says the latest report of the Intergovernmental Panel on Climate Change. The report also says Mumbai and Kolkata prone to coastal floodingPower everywhere ...
    ravleenposted 5 years 5 months agoread more
  • Himalayan glaciers could lose two-third mass by 2100The International Panel on Climate Change says this may hit India’s food security system andalso bring changes in the monsoon pattern. Famine, water shortage and regional conflicts are also expected in South Asia, especially IndiaWater in Ludhian...
    ravleenposted 5 years 5 months agoread more
  • Thermal power plants India's biggest water guzzling industryMost of the older generation thermal plants in India use open loop–wet cooling systems which accounts for 40-80 times more water use than the world average. These plants constitute 88% of the total industrial water demand in the countryIn...
    ravleenposted 5 years 5 months agoread more
  • The Water and energy nexusA report released by the United Nations in Tokyo this World Water Day says places where people do not have adequate access to water largely coincide with those where people have no electric powerNGT demands report on fluorosis in Maharashtra12 districts in the state are aff...
    ravleenposted 5 years 5 months agoread more
  • Our four year old borewell is 6 inch deep with 650 feet silt at the bottom, 25 feet pump and 5 HP air compressor water pipe. The static level of water is 600 feet. Till last summer we got good yielding from the borewell but then the yield had gone down to 5000- 7000 litres per hour, later to 3000 li...
    Anonymous (not verified)posted 5 years 6 months agoread more
  • Maharashtra reels under hail stormsFarmers of Marathwada, Vidarbha, Northern Maharashtra and parts of Western Maharashtra are facing the impacts of unprecedented hail storms and unseasonal rainfall. Nearly, 12 lakh hectares of crops have been destroyed due to the disaster, along with spread of ...
    swatiposted 5 years 6 months agoread more
  • The theme of this year’s World Water Day was “energy-water nexus”. It was almost as if the topic was chosen keeping Western Uttar Pradesh in mind because the conflict between water and energy users in agriculture and industry has heightened here in the recent past. The area's groundwater has b...
    Amita Bhaduriposted 5 years 6 months agoread more
  • I stay in Aurangabad, Maharashtra, where I live it does not have corporation's pipe water connection. I had taken connection from a water line which is 250 meters away from my house, but we don't receive sufficient amount of water though we are using motors for water suction. Our neighbours also fac...
    Anonymous (not verified)posted 5 years 6 months agoread more
  • IWMI-Tata Water Policy Program (ITP), a project that focusses on policy research in the co-management of energy & groundwater, has been awarded the 2014 UN ‘Water for life’ award!Mr. Jarraud, chair of UN-WATER said, “The UN-WATER 'Water for Life' Best Practices Award is an important prize ...
    sabitakaushalposted 5 years 6 months agoread more
  • Hi, I have dug a borewell 430 ft deep at Ulsoor in Bangalore. Four months ago the motor got stuck in the borewell and I pulled the motor up using air pressure. The motor was then repaired and while re-installing the motor it got stuck again. I called the borewell camera person who confirmed that the...
    Anonymous (not verified)posted 5 years 6 months agoread more
  • We want to replace our 3 HP motor with a new one. Can you provide a list of options from which we can choose a best quality, cost effective pump with best services, reliability and warranty. The specifications are: borewell is 900 ft deep and water has to be pumped to the overhead tank which is abov...
    Anonymous (not verified)posted 5 years 6 months agoread more
  • Need to find source of uranium contamination in Punjab: Experts Doctors in Patiala say Centre should support the state government to find out how uranium is constantly contaminating water in the state, especially in the Malwa belt. Excessive use of pesticides over the years is said to be a poss...
    ravleenposted 5 years 6 months agoread more
  • India to get its first solar-powered toilet The waterless toilet converts human waste into charcoal that can be used as fertilizer in farming or as a fuel, say researchers at the University of Colorado who developed the toilet.Grams in Tripura not 'Nirmal'None of the 108 villages in Tripura declared...
    ravleenposted 5 years 6 months agoread more
  • In our apartment, we have a borewell around 250 to 300 ft deep. Recently, the borewell pump was not working and we tried to pull the pump out but was unable to pull it out. We called the borewell people, who tried to pull the pump using chain pulley and cable rope through the PVC pipe. Despite their...
    Anonymous (not verified)posted 5 years 6 months agoread more
  • No Govt in Delhi means no water for DwarkaThe locality has to source its water from Gurgaon now, as even the number of water tankers that used to meet its demand till now, have reduced. The Delhi Development Authority says nothing can happen unless neighbouring Haryana releases water from the Munak ...
    ravleenposted 5 years 6 months agoread more
  • 24*7 water relief for BelgaumThe 24*7 water supply by the Karnataka Urban Water and Sanitation Improvement Programme in collaboration with a private company to about 10% the population in the city has been able to curb water-borne diseases due to high pressure in pipelinesArsenicosis widespread but ...
    ravleenposted 5 years 6 months agoread more
  • 764 industries behind Ganga pollutionIn a survey conducted between 2011 and 2013, the Central Pollution Control Board identified the polluting industries in five states on the main stem of the river and its tributariesIneffective chlorination behind railway stations' contaminated waterAbout seven la...
    ravleenposted 5 years 6 months agoread more
  • India's first river interlinking project inuaguratedBJP leader LK Advani inuagurated the first phase of the Narmada-Kshipra river interlinking project in Ujjaini village near Indore. The 432 crore project will lift water from the Narmada with pumps upto a height of 350 metres from a distance of 50 k...
    ravleenposted 5 years 7 months agoread more
  • Hi, We have dug a borewell 270 ft deep in a school building. The water level of the borewell is 100 ft. We want to install a motor which has the capacity to pump water from 240-250 ft deep, then transfer the water to the other corner of the building 200 ft away and then further lift the water to ...
    Anonymous (not verified)posted 5 years 7 months agoread more

Pages

A video tells the story of a poor farmer who, through effective water conservation methods, became rich and a role model to other villagers.

Vasant Baburao Parkale, a 52-year-old farmer, has become a role model for many farmers in the drought-prone Marathwada region. His determination and the will to excel in life have helped him to transform his dreams into reality.

Topics

Sub-Categories

Regions

Hi, In my farming land I recently drilled a new bore well. It's got stuck and we are not able to lift it out with chain blocker. Bore well details Total Feet: 180 Casing Feet: 60 (6") Motor type: 3HP motor (4") connected Pipe: HDPE single pipe (150 feets) Motor pump is at 135 feets deep in bore well. Now on top of motor almost 50 feet mud fell. When we checked with thread it went up to 80 feet only. We checked with some bore well vendors who said with air pressure in the bore pump there may be a 50% chance only to pull out the motor pump from bore well.

Topics

Sub-Categories

Regions

I put 300 feet borewell, in my area yield is moderate... is there any submersible pump with less output power for 300 feet borewell? I'm hesitatant to use compressor as it is noisy. Please suggest.

Topics

Sub-Categories

Regions

We had 100 Ft bore which went dry, we called borewell driller, they came, remove old motor and drilled additional 150 Ft, ( water was found at 220-240 ft) We installed new motor, new pipes, wire and rope. After starting motor, to our dismay, delivery was around 1/2 inch only. But driller had said we wil get 1 inch to 1.5 inch for sure. So he told us to remove the motor and check it. So we started to remove the motor ( it was kep at around 230-240 ft). After pulling out 50-55 ft, it got stuck. They tried to use chain block and pulley to remove it, but not successful .

Topics

Sub-Categories

Regions

I have recently dug borewell of 935 feet deep got water table at 2 stages, 1 at 570 feet stage and other at 825 feet, now what stage motor should I buy and what HP? Which company motor, and I am thinking to lower up to 850ft, have done casing for 420ft as up 500ft it's loose mud. Please advise me on stage, HP and company of pump I have to buy.

Topics

Sub-Categories

Regions

Sir, around eight months ago I dug a submersible borewell in my house. It is around 180 feet deep. After installation it started giving water with very fine yellow sand and it is still continuing. Is there any solution to this problem or I have to dig another borewell?

Topics

Sub-Categories

Regions

I have installed new one HP jet motor at my home bore well is of 60 feet, due to water issues ... We had recently opened the bore, cleaned it and installed new jet and added 7 feet of pipe to extend the motor and there is water also till 15 feet in the ground.

Topics

Sub-Categories

Regions

I have drilled a borewell (1006 Feet) in 2015 December - I got water in two sources (2.5 inches) one at 550 Ft and the other at 750 Ft. Earlier I used to get water continuously even for 6-7 hours/day. But nowadays i am getting water continously only for 30 minutes, after that I'm not getting water. I need to wait for 1.5 hours to run the next cycle. I placed the pump at 850 feet, (4HP 40 Stage/ AQUQ TeXMO - Model RF10A/40) - so I am planning to lower the pump at 990 feet to at least get water continuously for 1 to 1.5 hours).

Topics

Sub-Categories

Regions

Pettugodalu is a small village in Hukumpeta, a tribal mandal of Visakhapatnam District with 150 members. The village has 30 acres of the land, 100% dependent on rainfall. There is a stream passing at 200 feet distance to the land and at a depth of 70 feet where from June to January, water flows at 3 feet height. The villagers are ready to give half of acre of land for storing the water. But, the issue is that all the villagers are wage seekers, and cannot invest from their pockets. The panchayat has come forward to invest 10,000 rupees to bring the water to these 30 acres.

Topics

Sub-Categories

Regions

I AM NOW HAVING A COMPRESSOR MOTOR FOR MY BOREWELL. 1 HP MOTOR & 1.5 HP COMPRESSOR. IT TAKES , OF LATE, A VERY LONG TIME ABOUT 4 HOURS TO FILL THE TANK. 6 FT X 6 FT X 5 FT . MY VILLAGE IS VAIYAMPATTI IN MANAPPARAI TALUK , TIRUCHIRAPPALLI DISTRICT, TAMILNADU. A DRY PLACE. NO RIVERS . NO LAKES. RAIN SHORT FALL. WATER IS AT 340 FT AND APPROXIMATELY 5 FT WATER IS THERE. (340 TO 345) . CAN I GO FOR A SUBMERSIBLE MOTOR? PLEASE ADVISE WHETHER TO GO FOR A SUBMERSIBLE MOTOR OR FIX A COMPRESSOR MOTOR WITH INCREASED HP. PLEASE SUGGEST THE HP FOR THE MOTOR YOU SUGGEST. 

Topics

Sub-Categories

Regions

Pages

Subscribe to RSS - Pumps and Motors