A dry bore well during drilling can be water bearing after some time. You may check whether this has happened to your dry bore well. You may find some useful information in this regard at https://www.indiawaterportal.org/questions/failed-borewell-hyderabad-andhra-pradesh-need-advice-chances-recharge

Topics

Sub-Categories

Regions

To enhance yield in the bore well, you can opt for multi hydro-fracturing methodology, as it looks like your bore well is surrounded by fractured zones at deeper levels. May be some of the main fractured conduits might not have been feeding into your bore well fractures or some other bore wells are sharing your fractured conduits and they might be sucking water from your bore well owing to their locational advantage.

Topics

Sub-Categories

Regions

Well water becoming bad with lather and foul smell in every rainy season but turning good in other seasons indicates poor construction quality of the bore well.

Topics

Sub-Categories

Regions

Possible reasons are,

Loose fitting of casing pipe. The seepage water from the top loose formation while trickling down will carry the colloidal clay particle and enter into the bore well through the gap between seating and pipe end. The trickling would be a flow if you have met with good water yielding zone in the loose weathered part. This over the nonpumping period will fill the bore along with the source water from the other zone. If the static water level stands above the casing bottom then the flow will be less.

Topics

Sub-Categories

Regions

It is clear that well development and construction was not done properly. A professional driller prepares litholog,time log and variation in the hammer sound and decides about insertion of blank and slotted casing pipe. This practice was in vogue, even when drilling has been carried out in hard rock terrain.

Topics

Sub-Categories

Regions

As it is difficult to make extrusions using polyvinyl chloride (PVC), it becomes necessary to add plasticizers to make the compound pliable. As plasticized PVC is dense, brittle and susceptible to cracking, unplasticized PVC (UPVC) was invented by adding certain other additives which protect it from weathering and impart high impact strength. UPVC pipes are non-corrosive, with glossy smooth finish both internally and externally. They do not support bacterial growth or encrustation. They are non-toxic with high quality. They have great strength with uniform wall thickness.

Topics

Sub-Categories

Regions

Try to drop a small pebble (glass marble) , approximately 5 mm in diameter and measure the amount of time it takes to touch the water. The thumb rule is about 15 ft per second hence if water is at around 90 ft, it should take 6 seconds to strike water. The sound would be loud and audible on surface. Once that is confirmed pour some water, say about 1000 liters in the well and see if the pump is functioning properly. At a minimum, 60% of the water that you put in should be pumped out.

Topics

Sub-Categories

Regions

Hydrofracturing is a well development process that involves injecting water under high pressure into a bedrock formation via the well. This is intended to increase the size and extent of existing bedrock fractures, pumping water into those fractures at pressures as high as 3000 psi and flow rates as high as 85 gallons per minute, this cleans out the fractures and allows them to interconnect with nearby water bearing fractures. Water can then flow back thru these fractures and into the well at a faster rate than before.

Topics

Sub-Categories

Regions

Video graph or camera test is useful only to ascertain the type of formation and sequences of the strata encountered. Video testing can be done in the water column to analyse and reassess the formation details. It is used in problematic wells to find out the cracks and fractures and its depth, so as to ascertain the packer installation depths for hydro fracturing or blasting. It is useful in solving some well construction problems where it will be difficult without the data of the strata structures.

Topics

Sub-Categories

Regions

It is the normal practice to drill 6½-inch bore wells in the hard rock areas of Bangalore with blank casing installed deep into the hard rock and no casing pipe at all beyond that depth so that only clear water free of turbidity enters the well from one or more water-bearing fractures within hard rock. Care is taken to disallow any muddy water entering the well from surface or shallow depths by sealing the annular spacing between the casing pipes and between the casing pipe and the adjoining geological formation.