Bangalore

Pages

Hi, we have a borewell, 4 inches in diameter and 80 ft deep. When the mechanic was unscrewing the pipe from the joint, the pvc pipe was broken from the joint accidentally and a 1 inch pipe had dropped inside the borewell. Is there any way to pull out the pipe from the borewell ? Please mail me your suggestion or contact me on my cell no: 9439978660, bbsr.basanta@gmail.com.

Topics

Sub-Categories

Regions

Hi, I had dug a borewell inside my house in Bangalore, with the total depth of 900 ft. Water level is at 250 ft but there are four gaps in the borewell at 179 ft, 380 ft, 760 ft and 790 ft. Also, there is so much mud in the borewell. Please advise which motor, pump and pipe should be used.

Topics

Sub-Categories

Regions

Hi,

I have drilled a borewell, 800 ft deep in Bangalore. I want to install a motor for the same at 750 ft. What capacity of motor and electric power should I go for? Please advise.

Thanks
Praveen

Topics

Sub-Categories

Regions

Hi,

I have dug a borewell 760 ft deep and found some silt at 270 ft and 600 ft. A plastic casing has been put throughout the depth of the borewell. In case I want to dig the borewell a few feet deeper then do I have to remove the plastic casing?

Regards
Praveen

Topics

Sub-Categories

Regions

I would like to understand what does air passing mean. We have drilled a borewell in Bangalore. We have got the water source at 850 ft and tried to drill it further. When we reached 875 ft, driller told us that it cannot be drilled further as there is air passing in the borewell. Please help to understand about "air passing" and suggest a better water source.

Thank you.

Topics

Sub-Categories

Regions

Contaminated water killed 13,000 in last four years

Uttar Pradesh had maximum 3,382 deaths followed by West Bengal, Andhra Pradesh and Odisha, reveals data from the Union Ministry of Health and Family Welfare. Diarrhoea claimed most number of lives. 

Woman slaps AAP MLA over water supply issue in Delhi

River diversion project launch put off

The Yettinahole project, which Union Environment Minister Veerappa Moily was to launch, has not received clearance from the environment and forest department yet. Timely letter by NGO SANDRP puts brakes on the launch plans

Patna to have biggest sewerage project of India

We are not getting water for past 2-3 months from our borewell. The borewell is 880 ft deep, water level is till 535 ft, two water sources, one at 90 ft and other at 795 ft. Our existing pipe reaches till 856 ft. The yield of this borewell is low. The team who pulled the borewell is suggesting us to replace the column pipe which is 1.5" diameter to 1.25". I would like to understand if the diameter of the column pipe can cause such an issue?

Topics

Sub-Categories

Regions

Hello, I have re-bored my existing borewell after 2 years and its depth has increased from 600 ft to 900 ft. The pipe of the borewell has been extended upto 850 ft. But suddenly motor power has increased to 15 and sometimes in the night the motor stops working. The mechanic has advised to take out the motor and inspect, but I am worried about the joint, if it will break. Please suggest is it safe to continue the connection with a jointed pipe or do I need to replace the entire pipe all over again. I really don't know the reason as to why the amp meter is showing above 10.

Topics

Sub-Categories

Regions

Water for Mumbai a cost to ecology

All 12 dams planned to quench Mumbai's thirst fall in the ecologically sensitive region of Western Ghats. Will submerge more than 22,000 hectares.

We welcome tourists, not their plastice bottles

Pages

Subscribe to RSS - Bangalore