Need solution regarding presence of loose soil in borewell

We drilled 7 inch borewell for agricultural purpose. Hit the rock at 66 feet. Encountered 3 inches of water at 100 feet. After 110 feet loose soil encountered. The water was very muddy. The contractor stopped drilling after 205 feet. What should I do? The borewell has dried now. Is furthur drilling possible for more depth?

by
25 April 2019