Vellore District

Pages

Andhra coast reels under cyclone Helen

Following Phailin, cyclone Helen creates a havoc in Krishna and Godavari delta areas of Andhra Pradesh. The cyclone killed seven people and destroyed paddy crops worth Rs. 5000 crore.

Rajasthan mute as MP proceeds with dam project in inter-state Chambal basin

Hello,

Is CE marked uPVC pipes used in borewells fitted with submersible pump available in India?

Topics

Sub-Categories

Regions

Hello,

I am a B.tech student. I need the daily rainfall averages for Niligiris for the last 10 years for my project on landslide and rainfall prediction. Can you please help me obtain the data?

Topics

Sub-Categories

Regions

Tribal's houses taken to feed the nation's economy

For residents of Tamnar block of Raigarh, the public hearing to aquire land for mining coal by Jindal Steel and Power Plant was just a formality, as MoEF is under huge pressure to clear the project.

India accused of violating Indus water treaty

Hydro projects on Subansiri to affect downstream stretch 

The cumulative impact report by CWC on hydel projects on Subansiri river basin in Arunachal Pradesh raises possibility of reduced water level in downstream areas.

Development funds include climate grants

This paper describes the findings of a study conducted in Nelvoy village in Vellore district, Tamil Nadu, India.

 The study attempted to understand the phenomenon of water contamination in the village by using GIS as a tool to locate and map water supply and sewage distribution systems in the village, in relation to human and animal dwellings, their wastes, sanitary practices and their connections with drinking water quality for a clearer understanding of the connections between these factors and possible solutions to the problem.

Attachments

Topics

Sub-Categories

Regions

We just dug a new borewell last week and looking for suggestions for motor selections.  The borewell details:

Place; Tirupattur, Vellore District, Tamil Nadu

Diameter : 6.5 inches

Depth: 700 ft

Type: New

Water level : first water at 45 feet, and continued until 120 feet.  After that no water found until 700ft

PVC casing : upto 75 feet

Loose soil found at the start and hence another 10 inches pipe kept for first 16 feet (as the bore initially become like a well and bore could not be be dug further).

Topics

Sub-Categories

Regions

The Highlights of the Droplets Newletter - Everything About Water

Article and Image Courtesy: Everything About Water

Droplets newsletter

The December edition of Droplets e-newsletter published by the Everything About Water had the following highlights:

Attachments

Topics

Sub-Categories

Regions

Pages

Subscribe to RSS - Vellore District